-
October 2026
Robotics fleets: credit, recovery and continuity risk
Where emerging fleet financings depart from conventional equipment analysis.
Read the note (PDF)The methodology overview, covering framework architecture, instrument descriptions and sample output structure, is available on request. Request it.
-
October 2026
GPU collateral: sizing to peak stressed LTV
Amortisation profiles, stressed recovery curves and continuity risk in AI accelerator facilities.
Read the note (PDF)The methodology overview, covering framework architecture, instrument descriptions and sample output structure, is available on request. Request it.
The methodology overview, covering framework architecture, instrument descriptions and sample output structure, is available on request. Request the methodology overview.
© 2026 SOMA Assurance. These notes may be circulated in full with attribution.